Scope/Summary:
The scope of work for this project includes resurfacing the existing running track, expanded event areas and adding new perimeter fencing. Also included is a modification to the existing irrigation and storm drainage systems.
Project Team:
Engineer: RICK Engineering Company
General Contractor: PK Mechanical Systems, Inc.
Program Manager: Fred Parker, Gafcon, Inc.
Project Manager: Frank Gonzalez, Gafcon, Inc.
Proposition V Program Manager: Gafcon, Inc.