Track Enhancement Phase 1
Project Budget: $2,615,466
 
Construction Duration: August 2016 - May 2017
 
Funding Source: Proposition V
 
​
Scope/Summary:
 
The scope of work for this project includes resurfacing the existing running track, expanded event areas and adding new perimeter fencing. Also included is a modification to the existing irrigation and storm drainage systems.
 
      Project Team:
  • Engineer: RICK Engineering Company
  • General Contractor: PK Mechanical Systems, Inc.
  • Program Manager: Fred Parker, Gafcon, Inc.
  • Project Manager: Frank Gonzalez, Gafcon, Inc.
  • Proposition V Program Manager: Gafcon, Inc.