Phase 2 Parking Lot/Roadway Repairs
 
Project Budget:
Construction Duration:
Funding Source:
​
 
$669,000
December 2015 - January 2016
Proposition V
 
 
Scope/Summary:
 
The project includes repairs in Lots 1 and 2 and the median between. A bid alternate has been included for the slurry seal of Lot 5.
 
Project Team:
  • Engineer: Michael Baker International
  • General Contractor: PAL General Engineering, Inc.
  • Program Manager: Penny McGrew, Gafcon, Inc.
  • Project Manager: Prince Dumaran, Gafcon, Inc.
  • Proposition R & V Program Manager: Gafcon, Inc.