Master Pump
 
Project Estimate:
Anticipated Construction Start:
Funding Source:
$3,800,000
November 2021
Proposition V
 
 
Scope/Summary:
 
The installation of a central booster pump house will provide reliable water pressure for the campus. 
The booster pump house will serve the Grossmont College domestic water, irrigation, and fire lane campus utilities. 
The projects also includes the bus loop turn improvement and ball field irrigation booster pump.
 
Project Team:
  • Engineer: Shadpour Consulting Engineers, Inc.
  • General Contractor: TBD
  • Program Manager: Jim Bray, Gafcon, Inc.
  • Project Manager: Aman Mehrzai, Gafcon, Inc.
  • Proposition V Program Manager: Gafcon, Inc.