Science, Math, & Career Tech Complex Phase 2-Building 36
    
   Construction Estimate:
   Anticipated Construction Duration:
   Funding Source:
$36.15 million
Summer 2020 - Winter 2022
Proposition V
 
 
    Scope/Summary:
 
Phase 2 of the Math Sciences, Vets and Career Tech includes demolishing the existing Building 36 and constructing a new two story building of approximately 59,000 GSF, followed by the demolition of buildings 37, 38B, and 38C. The first floor building functions will include a new Veterans space with storage below, Math Computer Lab, Conference Rooms, Physical Geography and Oceanography, Human Geography and Social Sciences, Geology, workroom, Tech office, and a shared classroom. The second floor level will include a Tutoring Center, Math offices, Adjunct offices Lobby, Math Classrooms and classroom for Anthropology balconies and an observation deck at the west end.
 
    Project Team:
  • Architect: LPA, Inc.
  • Program Manager: Jim Bray, Gafcon, Inc.
  • Campus Project Manager: Jim Davies, Gafcon, Inc.
  • Proposition V Program Manager: Gafcon, Inc.